Broiler

Tarlac City, Tarlac

An existing facility upgraded for higher throughput and longer asset life, re-engineered without giving up manual harvest flexibility.

Tarlac City, Tarlac

Converted broiler house at Tarlac City.
Engineering Blueprint

Facility Specifications

Flock / Herd Capacity 100,224 birds per building
Facility Buildings 5 Structures
Structure Footprint 150m × 16m
Assembly Turnaround Phased retrofit per house
Type Conversion, Manual Harvest
Total Flock 501,120 birds
Case Narrative

How this facility was engineered and delivered.

Tarlac City was an existing traditional broiler operation struggling with thermal inefficiencies, high mortality rates during hot summer months, and deteriorating timber trusses.

Rather than bulldozing the site, Maagir engineered a phased retrofit program. Each building was structurally reinforced with galvanized steel posts, fitted with sealed insulated ceiling panels, and upgraded with modern tunnel ventilation.

The conversion increased stocking density to 100,224 birds per house while lowering the Feed Conversion Ratio (FCR), proving that legacy farm assets can be modernized without interrupting commercial cashflow.